0102030405
China Waste Heat Boiler for Zn and Cu Sulphide Ore Recovery - Suppliers & Factory Direct Solutions
Application
Simple design, easy operation, low failure.
Design capacity: 700p/h, actual processing capacity of 600 p/h.
Reasonable design of mechanical structure, ingenious design, many structures have great improvements than traditional units, parts in contact with acid liquor adopt 316L (316L uses custom-made sectional materials).
The hydraulic system uses Rexroth products, multiple parts use an electro-hydraulic proportional control system, for units with high standards for the reliability of hydraulic units choose the most advanced threaded cartridge valves.
The electrical system uses Siemens components, SIMENS S7 300 /1500 PLC programming device, LCD touch screen, Windows operation interface, which can have data communication with upper computers.
Frequently Asked Questions
What are your prices?
Our prices are subject to the specific model and configuration requirements. Please contact our sales team for a detailed quote.
Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.
What is the average lead time?
The average lead time is typically 3 months after the receipt of the advance payment, depending on the order volume and customization.
What kinds of payment methods do you accept?
Payment methods are negotiable to ensure mutual convenience. Common methods include T/T and L/C.
Is technical support available for installation?
Yes, we provide comprehensive technical support and can arrange for professional guidance during the installation and commissioning phase.
Do you offer customization for specific industrial needs?
Absolutely. Our mechanical and electrical systems are designed to be flexible, allowing for modifications to meet specific operational requirements.

